Skip to content
Anton Muckel Gerüstbau GmbH Scaffolding, stair towers, hire
Enquiry

Geilenkirchen, Heinsberg district

Stair towers and site stairs for construction sites in Geilenkirchen

Anyone who has to go up with tools and material every day needs a proper way up. Anton Muckel Gerüstbau plans, erects and hires out stair towers, site stairs and escape stairs.

Yard
Im Gansbruch 22, Linnich
01 Flight, landing, flight. A way up repeats the same figure until it is at the top. A stair tower sets that figure beside the scaffold.
01

Field note

The way up decides how the day runs

On a ladder one hand is spent holding on. A site stair leaves both hands free, carries tools and material, and carries several trades at once. You do not notice it on the first day. You notice it at the end of the week.

So we build the way up as a structure of its own: founded on ground that carries it, tied into the scaffold, with an exit at every lift that is actually used.

Stair tower systems

A tower of its own beside the scaffold. Landing above landing, with an exit at every lift that is needed.

Escape stairs

A second way down that stays clear when the first one does not.

Hire

Tower, lift or machine for as long as the site runs. We put it up and take it down again.

02

What we put up

Stair towers, site stairs, escape stairs

Stair tower systems and escape stairs stand in the service list of Anton Muckel Gerüstbau alongside the rest of the scaffolding work. On site the two belong together: the working level and the way to it.

01 Stair tower systems

The free standing or tied way up, lift by lift, with landings and handrails on both sides.

02 Escape stairs

The second way down, kept clear and kept apart from the route the material takes.

03 Facade scaffolding

The working level along the facade, which the stair tower meets at every lift.

04 Modular scaffolding

System components for plans that are not rectangular, and for junctions no standard part covers.

05 Heavy duty scaffolding

For when the load is not the person but what the person sets down.

06 Birdcage and suspended scaffolding

Inside across the whole floor, or hung, where there is no bearing free below.

07 Special structures and roofing over

Weather protection, encapsulation and special shapes, where the standard answer fails on site.

08 Stage building

Stage, stand and technical tower for as long as the event runs.

09 Industrial and mobile towers

In the plant, in the vessel and in the hall, or on castors where the reach is short and the job is small.

02 The working level along the facade, decks lift above lift. This is exactly where a stair tower ties in.
03

Yard and hire

Telehandler, lorry crane and lifts

Scaffolding also means moving the material. Anton Muckel Gerüstbau runs telehandlers with various attachments as well as a lorry with a loading crane and container body, and hires out lifts with and without passenger carriage.

The three photographs below show the telehandler with an attachment for gripping and cutting timber, and the lorry crane behind it. They do not show a stair tower.

03 The telehandler stands on extended outriggers. An attachment hangs from the boom, and the lorry crane stands behind it.
04 The attachment grips and cuts in one movement. The log is held firm in the grab.
05 The grab holds the log crossways while the boom carries it aside.

What is hired out

  • Lifts with and without passenger carriage
  • Telehandlers with various attachments
  • Lorry with loading crane and container body
  • Scaffolding and stair towers for as long as the site runs
Ask about a machine or a lift
04

How it runs

From the enquiry to the strike

Five steps, in this order. None of it happens before you have it in writing.

01

Enquiry

You write or call and say where, how high and for how long.

02

Site visit

We look at the ground, the access and the points to tie into.

03

Quotation

Erection, standing time and dismantling are fixed in writing before a single component is loaded.

04

Erection

The tower is founded, tied in, raised lift by lift and handed over.

05

Standing time and strike

We are reachable while it stands. Afterwards we clear the site again.

05

Pictures

Photographs from the yard and pictures of the subject

The machine, the lorry crane and the attachment from the yard, and pictures of the stairway, the scaffold and the working level.

06 Close up: rotator, grab arms, cutting head. The company name is on the lorry behind.
07 Two logs in the grab. The boom carries them out over the barrier tape.
08 Set down. The barrier tape in the foreground keeps the area clear.
09 The lifts are numbered. Single workers move between them.
10 Access by a leaning ladder, two trades on the same lift.
06

Enquiry

Tell us where, how high and for how long

Three answers are enough for a quotation. The rest we settle by telephone or on site.

The building, the height and roughly how long it stands
07

Area

Geilenkirchen and the Heinsberg district

The yard is in Linnich, Im Gansbruch 22. The work is done in Geilenkirchen and in the places around it.

In Geilenkirchen

  • Hünshoven
  • Bauchem
  • Beeck
  • Gillrath
  • Grotenrath
  • Hatterath
  • Immendorf
  • Lindern
  • Niederheid
  • Prummern
  • Süggerath
  • Teveren
  • Tripsrath
  • Waurichen
  • Würm
  • Leiffarth

Round about

  • Gangelt
  • Heinsberg
  • Hückelhoven
  • Übach-Palenberg
  • Baesweiler
  • Linnich
08

Asked before

What people usually ask before the first enquiry

Call Enquiry